This document summarizes the working hours and costs of construction equipment over a period from August 8-26. It shows that an excavator worked 156 hours during the day at a rate of Rp375,000 per hour, totaling Rp58.5 million. A grader worked 56 hours at a rate of Rp325,000 per hour, totaling Rp18.2 million. The excavator also worked 16 nighttime hours. In total, the equipment costs were Rp82.7 million plus 10% VAT of Rp8.27 million, for a grand total of Rp90.97 million over 228 working hours.