Gujarat Battery Storage RfS Amendment 2022 by shubhamkh02 is a document available to read on EtoBox.
What is Gujarat Battery Storage RfS Amendment 2022 about?
The document summarizes amendments made to the Request for Selection (RfS) Document for setting up Pilot Projects of 500 MW/1000 MWh Standalone Battery Energy Storage Systems in Gujarat. Key amendments include extending the scheduled commissioning date for projects above 250 MW capacity to 24 months, revising the minimum dispatchable capacity degradation schedule, increasing the allowable maximum recovery time for BESS to 2 hours, and clarifying the tariff should be quoted in Indian Rupee per MW per month.