About this document
PCA Design & Build RCC Dam by tonykebbe is a document available to read on EtoBox.
The document discusses the design and construction of the Pine Brook RCC Dam in Colorado using a design-build approach. The dam was built to provide a reliable water supply for 400 customers. It is an 86-foot-tall roller-compacted concrete gravity dam that creates a 100 acre-foot reservoir. Construction began 8.5 months after design initiation and was completed on an aggressive schedule and budget.
- Author
- tonykebbe
- Language
- EN