Reservoir Cost Estimation Breakdown by Abdirahman ali is a document available to read on EtoBox.

The document provides a cost estimation table for constructing a reservoir with 5 line items: 1) Earth work including site clearing, excavation, backfilling and gravel packing. 2) Concrete work including forming the base slab, walls, top slab. 3) Steel reinforced bars of various diameters for reinforcement. 4) Pipe and fittings including overflow pipes and gates/valves. 5) Finishing including plastering of the interior walls and area between the reservoir and collection ditch. The total estimated cost for t