500 MW Generator Stator Lifting Report by Sumit Chaurasia is a document available to read on EtoBox.
The document provides a report on the unloading, lifting, and placement of a 500 MW generator stator weighing 265 metric tons for a power plant project in NTPC Kahalgaon. Normally this would be done using a portal crane, but one was not available. As an alternative, a strand jack method was proposed, which involved designing and constructing lifting structures both outside and inside the turbine hall to lift and maneuver the stator into place using steel strands. The project was awarded to Fagioli PSC and i