About this document
Cost Analysis for Half Gate Construction by sitheeq is a document available to read on EtoBox.
The document provides a detailed rate analysis for the construction of a main pumping station gate in Kandy, including materials, labor, equipment, and additional costs. The total estimated cost for half of the gate is LKR 198,376.15, with a final cost of LKR 396,752.30 per item after including overhead and profit. Various materials and labor costs are itemized with specific quantities and rates.
- Author
- sitheeq
- Language
- EN