In A 300mm THK Pavement Until The Bottom of The Bar by Jeric Santos is a document available to read on EtoBox.
To reinforce the connection between a new 250mm thick slab and an existing 300mm thick pavement, shear dowels should be used to ensure composite action. Surface preparation is crucial, involving roughening the existing concrete and possibly applying a bonding agent. New rebar can be hooked into the existing rebar, and additional transverse tie bars may be added for improved performance against cracking.