Skip to content

Opening book details…

About this document

Plastering Area Measurements Report by justjeff4bpi is a document available to read on EtoBox.

The document details plastering work completed at Candon National High School as of April 19, 2024. It lists the width, height, and total area of various grid sections and areas both inside and outside, as well as the linear meter of kanto sections. The total plastered area inside was 268.0515 square meters, outside was 12.0432 square meters, and for kanto sections was 55.18 linear meters.

Author
justjeff4bpi
Language
EN