This document provides a cost estimate for the labor and equipment needed to remove existing 69kV and 13.2kV lines at City Proper Substation. The total estimated cost is PHP 160,227.65 including VAT. The work includes hauling poles, cables, line equipment and accessories; removing the 69kV and 13.2kV lines, line dressings, poles and guying system. Details of labor and equipment costs are provided separately for the 13.2kV and 69kV line removal work.