Can I read LEV-CO-22 Main Stair Steel Railing on EtoBox?
LEV-CO-22 Main Stair Steel Railing by Rhenly Garin is a document available to read on EtoBox.
What is LEV-CO-22 Main Stair Steel Railing about?
This document outlines Change Order No. 22 for the Leviste Residence project, detailing the costs associated with the installation of a main stair steel railing in matte automotive paint finish. The total cost for the change order amounts to 84,661.16, including material and labor costs. The document is prepared and recommended by project engineers and submitted by Cacho Constructions, Inc.