Mitigation Options for 220kV Grid Overloading by ehsanelahi762 is a document available to read on EtoBox.
This document discusses four options to mitigate overloading at the 220kV Sarfaraz Nagar grid station: 1. Adding a third 160MVA transformer at the 220/132kV Okara grid station or diverting load to the 220kV WAPDA Town grid station. 2. Adding a new 160MVA autotransformer. 3. Augmenting one existing 160MVA transformer to 250MVA capacity. 4. Augmenting two existing 160MVA transformers to 250MVA capacity each at the QABP grid station. For each option, responsibilities are assigned for confirming technica