About this document
Sangvi-Bopodi River Bridge Project Bid by Jalal Tamboli is a document available to read on EtoBox.
This document provides details about the estimated costs and timeline for the Design & Construction of a New River Bridge on the Mula River connecting the Sanghvi-Bopodi Area. The estimated total cost of the project is 40.80 Crores with a performance security of 2.04 Crores required. The projected timeline for completion is 24 months including the monsoon season. Financial qualifications required include an annual turnover of 20.4 Crores and a bank solvency certificate of 8.16 Crores.
- Author
- Jalal Tamboli
- Language
- EN