About this document
Cutting Cold Glange by fzcug6143 is a document available to read on EtoBox.
The document outlines the Safe Job Procedure (SJP-07) for cold cutting existing pipe, emphasizing the importance of isolating systems and ensuring zero energy before work begins. It details required personal protective equipment, training, tools, and job steps, along with associated hazards and control measures for each step. Additionally, it references relevant regulations and previous revisions to ensure compliance and safety during the procedure.
- Author
- fzcug6143
- Language
- EN