Skip to content

Opening book details…

About this document

Time Setting of Portland Cement by MiNT Matias is a document available to read on EtoBox.

The document describes the steps to conduct a slump test on concrete mixtures. It involves: 1. Preparing and cleaning the mold. 2. Applying oil to the mold. 3. Using a mold of specific dimensions. 4. Pouring concrete into layers and tamping each layer. 5. Lifting the mold and measuring the slump. The results are recorded and analyzed to determine the workability and applications of each mixture. The sample with the highest water content had the highest workability.

Author
MiNT Matias
Language
EN