Skip to content

Opening book details…

About this document

Perak Mini Hydro Project Overview by Li Liu is a document available to read on EtoBox.

This document summarizes three mini hydro projects in Perak, Malaysia with a total capacity of 60 MW. Singgor Hydro is a 27 MW project located on the Singor River. Talang Hydro is a 19 MW project consisting of two facilities on the Sengoh and Talang Rivers. Temenggor Hydro is a 14 MW project made up of three facilities on the Cherendong, Sara, and Temengor Rivers. All three projects have obtained feed-in approvals and aim to begin operations between late 2019 and late 2022, selling power to the grid for 21

Author
Li Liu
Language
EN