About this document
6.2.7 Ups by anupongjir is a document available to read on EtoBox.
This document outlines a purchase order (No. 4500159224) from MMC Engineering & Construction Sdn. Bhd. to Duta Berkat Corporation Sdn. Bhd. for the supply and delivery of non-modular type DDC UPS and batteries for the PGU-1 Gas Pipeline Replacement Project in Terengganu. The total value of the order is RM 507,188.00, with a delivery date set for June 1, 2021, and specific terms and conditions outlined in the attachment. Acknowledgment of receipt is required within 7 days of delivery.
- Author
- anupongjir
- Language
- EN