Skip to content

Opening book details…

About this document

Machine Transportation and Installation Guide by yonas is a document available to read on EtoBox.

The document provides instructions for transporting, installing, and setting up a machine. It states that the machine should be lifted by its yoke when moving unpacked, and proper slings and pads should be used. All parts must be accounted for during unpacking, and claims after operation will not be accepted. The machine must be cleaned with diesel oil or recommended degreasers before installing. A level foundation is required, leaving at least 500mm of clearance, and the work table must be leveled to a tol

Author
yonas
Language
EN