About this document
Inspection Report on Flange Damage and Cladding by Devendar G is a document available to read on EtoBox.
Inspection revealed a damaged flange serration on piping de-spading, measuring 30x20x3mm. A technical note was provided to refine temperature control and hydrogen backout procedures following an overheating incident. Additionally, guidelines for pass partition plates in heat exchangers and cladding thickness requirements were noted based on API RP 582 recommendations.
- Author
- Devendar G
- Language
- EN