Building Plan Approval Process Guide by mariappan is a document available to read on EtoBox.

The document outlines the procedure for obtaining building plan approval in 4 steps: 1. The applicant registers online and works with a licensed surveyor to submit required documents and drawings. 2. The application is assigned to an Assistant Engineer who inspects the site and verifies documents within 7 days. 3. The Executive Engineer reviews and may request additional documents before approving the demand advice. 4. Once payment is made, the Assistant Engineer issues the final building permit and

Author
mariappan
Language
EN