About this document
BB6502 Hardware Failure Simulation Guide by Alerick Velasco is a document available to read on EtoBox.
The document describes the methodology for simulating a hardware failure of a BB6502 component. The steps include: 1) notifying the NOC and WATO of the activity, 2) performing a health check to ensure no existing alarms, 3) turning off the BB6502 power supply for 1.5 hours, 4) turning the power back on and waiting for restoration, 5) performing a final health check, 6) checking traffic and signals, and 7) notifying WATO that the activity is finished. A review notes the site was suppressed at 10:34am, power
- Author
- Alerick Velasco
- Language
- EN