Opening book details…
Can I read Mechanical Status Report for RB-22A on EtoBox?
Mechanical Status Report for RB-22A by fauzan kartiyasa is a document available to read on EtoBox.
What is Mechanical Status Report for RB-22A about?
This document provides a mechanical status report for well RB-22a. It details the well construction including casing strings from 9-5/8" at 614m to 5-1/5" at 948m. The tubing string and rod string are specified along with depth intervals. The last well service occurred on September 4, 1997 and included replacing the pump barrel and an acid wash.
- Author
- fauzan kartiyasa
- Language
- EN