About this document
Kebasu - Water Pumping Report by Kennedy Tembo is a document available to read on EtoBox.
The document is a simulation report for the SENATOR KEBASU WATER PUMPING project in Nyamira, Kenya, detailing a pumping PV system with a power output of 9.84 kWp. It provides data on water needs, energy production, and system efficiencies, indicating that 665 m³ of water was pumped, which is 81.8% short of the annual requirement of 3650 m³. The report includes various technical specifications, system losses, and performance metrics for the PV system and pump.
- Author
- Kennedy Tembo
- Language
- EN