About this document
Gladstone Reclaim Tunnel Upgrade Project by Prodip Sarkar is a document available to read on EtoBox.
The document describes upgrades made to improve the efficiency of conveyor systems at a coal terminal. Modifications were made to reclaim tunnel conveyors servicing stockpiles 16-18 to reduce spillage. This included redesigning the conveyor profile, widening loading point skirts, and redesigning discharger tube seals. Testing showed reductions in delays and spillage after the upgrades were installed.
- Author
- Prodip Sarkar
- Language
- EN