Can I read Generator Transformer Sizing Calculation on EtoBox?
Generator Transformer Sizing Calculation by tvpham123 is a document available to read on EtoBox.
What is Generator Transformer Sizing Calculation about?
1) A calculation was performed to determine the capacity of the generator transformer for the Mong Duong Thermal Power Plant Phase 1 project in Vietnam. 2) Based on the maximum generator output of 551.5 MW at 0.85 power factor, the required capacity of the generator transformer was calculated to be 648.8 MVA. 3) To account for the operating power factor range of 0.85 lagging to 0.9 leading, the generator transformer capacity was selected as 660 MVA to provide over 1% margin for all ambient temperature con
- Author
- tvpham123
- Language
- EN