About this document
Day Work Sheet for QG 1 Skid Backfilling by Myjaz Jaz is a document available to read on EtoBox.
The document contains daily work sheets from July 12-14 detailing a backfilling project. It lists 6 workers, their roles and hours worked, as well as 2 pieces of equipment used - a JCB and dump truck. Both were operated from 6am to 5pm for 9 hours each day. The project involved adding 25 cubic meters of type A structural fill material to the QG 1 metering skid and piperack area at the K105B location.
- Author
- Myjaz Jaz
- Language
- EN