Skip to content

Opening book details…

Can I read South Azadegan Daily Drilling Report on EtoBox?

South Azadegan Daily Drilling Report by masihajan1388 is a document available to read on EtoBox.

What is South Azadegan Daily Drilling Report about?

The KPE Daily Drilling Report for well AZNS-174 (ST-02) indicates that drilling has been ongoing for 806 days, with a total planned time of 117 days and currently 689 days behind schedule. The well is classified as a development well targeting the Fahliyan formation, with a total depth of 4200 meters planned. Recent operations included monitoring well pressure while the well remains shut in.

Author
masihajan1388
Language
EN

More by masihajan1388

Browse all works by masihajan1388