Foundation Settlement Inspection Guide by idris is a document available to read on EtoBox.
This work instruction provides an example of how to complete a structural inspection of a crane boom. It outlines the scope of work, areas to inspect, inspection requirements including visual, NDT, and UT wall thickness checks. Criteria for assessing coatings, corrosion, pitting and grooving are defined. The work scope is estimated to take 8 days and requires 2 NDT inspectors, 1 supervisor, and references various Sparrows inspection procedures and client standards. Safety precautions and site services requi