About this document
Pipe Sleeve Monitoring-090425 by Yang Tempest is a document available to read on EtoBox.
The document provides a detailed report on the percentage of installed pipe sleeves through beams and block-outs for the POWERPLANT MALL project in Angeles, Pampanga. It outlines the installation percentages for various floors, indicating whether the underbeam was considered or not. The report highlights specific floors with their respective installation percentages and notes the inclusion of block-outs.
- Author
- Yang Tempest
- Language
- EN