About this document
Weld Numbering Procedure for Gas Pipeline by Jovan Poznan is a document available to read on EtoBox.
This document outlines procedures for numbering welds on a gas transmission pipeline project in Serbia. It describes: 1) Welds will be numbered based on their location in the pipeline by kilometer point and sequential number. Example: Weld 84 ML 10 is at kilometer 84 of the mainline and is the 10th weld. 2) Special structures like road crossings and HDD sections will have their own numbering schemes outlined in appendices. 3) Responsibilities are defined for construction managers, welding engineers, mast
- Author
- Jovan Poznan
- Language
- EN