Skip to content

Opening book details…

Can I read 2025.04.23-DTM RT-54 To RT-55 DDR05-partners on EtoBox?

2025.04.23-DTM RT-54 To RT-55 DDR05-partners by secsection2017 is a document available to read on EtoBox.

What is 2025.04.23-DTM RT-54 To RT-55 DDR05-partners about?

The Well Construction Drilling Report dated 23/04/2025 details the progress of drilling operations from RT-54 to RT-55, with significant activities including rig disassembly and preparation for transportation. Safety measures are highlighted, with 62 days without lost time incidents and various safety meetings conducted. The report also includes operational metrics such as actual and planned durations, as well as daily time logs of activities performed.

Author
secsection2017
Language
EN