Skip to content

Opening book details…

Can I read Contract Rate Breakdown and Validity on EtoBox?

Contract Rate Breakdown and Validity by cRi Society is a document available to read on EtoBox.

What is Contract Rate Breakdown and Validity about?

The document outlines contract rates for electrical work, specifically detailing costs associated with 20A DP switches and their installation. The rates are RM200 per point, with total costs indicated as RM5600 and RM1200 for different sections. The document references M&E detail drawing PD/2661/E-003 for cabling requirements.

Author
cRi Society
Language
EN

More by cRi Society

Browse all works by cRi Society