About this document
Exp 2 by saniashaji223 is a document available to read on EtoBox.
The document outlines a cost breakdown for a construction project, detailing materials, labor, and conveyance charges. The total cost for materials is 3861, labor is 1765, and conveyance is 914.16, leading to a grand total of 7596.39584 after additional charges. The final total cost, including water charges and overhead, is 7596.39584.
- Author
- saniashaji223
- Language
- EN