Skip to content

Opening book details…

About this document

Exp 2 by saniashaji223 is a document available to read on EtoBox.

The document outlines a cost breakdown for a construction project, detailing materials, labor, and conveyance charges. The total cost for materials is 3861, labor is 1765, and conveyance is 914.16, leading to a grand total of 7596.39584 after additional charges. The final total cost, including water charges and overhead, is 7596.39584.

Author
saniashaji223
Language
EN