About this document
Navman T1 Inspection & Test Plan by Minh Nguyễn is a document available to read on EtoBox.
This inspection and test plan outlines quality control processes for an embedded part being manufactured for the El DaBaa NPP Unit 3 project. It includes: 1. Six key inspection activities to be conducted before and during fabrication, including submitting shop drawings, welding procedures, and third party testing qualifications for approval. Visual and painting inspections are also specified. 2. Acceptance criteria for each inspection derived from international and local standards. 3. Requirements for
- Author
- Minh Nguyễn
- Language
- EN