About this document
Sail Sabang 2017 Event Timeline by Yazid Hafzi Aziezi Muttaqin is a document available to read on EtoBox.
The document outlines the time table for Sail Sabang 2017, which included three phases: preparation, implementation, and conclusion. During the preparation phase in November, crews prepared one flight of KT-1B Woong Bee aircraft. The implementation phase took place from November 28th to December 5th, with the KT-1B conducting flights and displays. Finally, the concluding phase on December 5th saw the safe return of the KT-1B aircraft with support from two C-130 Hercules aircraft.
- Author
- Yazid Hafzi Aziezi Muttaqin
- Language
- EN