Skip to content

Opening book details…

About this document

Planned Shutdowns for January 4, 2018 by Muhammad is a document available to read on EtoBox.

The document provides a schedule of planned power shutdowns for various circuits and equipment on January 4th, 2018 by the Load Dispatch Center. Shutdowns are planned from 9am to 5pm for maintenance activities like painting, cleaning, relay replacement, and equipment installation. The affected grids and areas are noted, along with the circuits that will serve load during the shutdown periods. Relevant departments are informed of the shutdowns and load management plans.

Author
Muhammad
Language
EN