Opening book details…
Can I read PMRK-EPC2-52-PMT-LID-002 Interface List RevA on EtoBox?
PMRK-EPC2-52-PMT-LID-002 Interface List RevA by booster.hendri is a document available to read on EtoBox.
What is PMRK-EPC2-52-PMT-LID-002 Interface List RevA about?
The document outlines the project management details for the construction of a Booster Pump Station for Heavy Oil by PT Pertamina Gas and PT PGAS Solution. It includes an interface list, revision log, and responsibilities for engineering, documentation, and installation processes. The project aims to facilitate the transportation of heavy crude oil from various Central Gathering Stations to TBBM Dumai, with a planned capacity of 89,000 BOPD.
- Author
- booster.hendri
- Language
- EN