About this document
Fettuccine Truss Bridge Analysis by Kee Woon is a document available to read on EtoBox.
The objective of the fettuccine truss bridge project is to determine how loads are transferred through a truss bridge and identify which members are in tension or compression. Through studying an existing truss bridge, designing two proposals, and testing models, the group aims to enhance their understanding of force distribution in trusses. The final design must be a perfect truss bridge made only of fettuccine and glue, with a 6mm clear span and maximum weight of 15g.
- Author
- Kee Woon
- Language
- EN