Skip to content

Opening book details…

Can I read Boat Building Facility Cost Breakdown on EtoBox?

Boat Building Facility Cost Breakdown by TUD, RUBENA is a document available to read on EtoBox.

What is Boat Building Facility Cost Breakdown about?

The document outlines a project by the Department of Agriculture in the Philippines for the construction of Boat Making Facilities in Buhi, Camarines Sur, with a total cost of 4,429,735.80 PHP. It details the materials and labor required, including concrete and steel works, along with their respective quantities and costs. The project includes direct costs, contractor profit, overhead costs, and VAT, culminating in the total project cost.

Author
TUD, RUBENA
Language
EN