Can I read 33 KVA River Crossing Tower Installation on EtoBox?
33 KVA River Crossing Tower Installation by Jahirul Quaim is a document available to read on EtoBox.
What is 33 KVA River Crossing Tower Installation about?
This document provides details for the erection and stringing of a 33kV river crossing tower. It includes: 1) Installation of anchor and suspension towers across the river with minimum heights of 30m and 82m respectively, maintaining the required 21.35m navigation clearance. 2) Erection of 8 phase conductors and necessary joints across the 808m river span between the suspension towers on both sides of the river. 3) Painting of the suspension towers and installation of aircraft obstruction lights, warn
- Author
- Jahirul Quaim
- Language
- EN