Opening book details…
Can I read JSP Projects EDC Timetable 2019 on EtoBox?
JSP Projects EDC Timetable 2019 by vikash kumar is a document available to read on EtoBox.
What is JSP Projects EDC Timetable 2019 about?
The document outlines a planning schedule for ABC work in EUDC/EDC areas for JSP Projects Pvt. Ltd. It lists 13 jobs over 2 dates, with details of the area, feeder, location of work, duration of power shutdown, and contact information for the overseeing JE. The work involves upgrading infrastructure for better power distribution in Ghaziabad and Meerut.
- Author
- vikash kumar
- Language
- EN