Opening book details…
Can I read eni Iraq B.V. Contractor Details on EtoBox?
eni Iraq B.V. Contractor Details by Ashraf alZeidy is a document available to read on EtoBox.
What is eni Iraq B.V. Contractor Details about?
The document contains information about the prevailing wind direction and significant wind details for a plant located in Makka. It specifies true north at 58.680° and the prevailing wind at 143.32°. The document is proprietary to eni Iraq B.V. and is not to be shared with third parties.
- Author
- Ashraf alZeidy
- Language
- EN