Inspection Test Plan for Coring by Adnan is a document available to read on EtoBox.

This document provides an inspection and test plan for coring work at the refurbishment of the DOH HQ building. It outlines 6 main inspection items to be checked once including the main cradle control box, main control box, limit switches, and hydraulic equipment. Each main item has multiple sub-items to be inspected and tested with acceptance criteria according to EN1808 standards. Responsibilities for inspection and sign off are assigned to the contractor, engineer, and Musanada representatives.