Skip to content

Opening book details…

Can I read Turbine P.21 Start-Up Monitoring Report on EtoBox?

Turbine P.21 Start-Up Monitoring Report by zuhantoro is a document available to read on EtoBox.

What is Turbine P.21 Start-Up Monitoring Report about?

This report summarizes turbine monitoring data for period VII/2009. Key metrics include: 1) Turbine 1 temperature is 90°F, turbine 7 average temperature is 936°F, and active turbine temperature controllers is 1. 2) The engine fired hours are 686 hours and engine start count is 84. Exhaust purge time is 0 seconds. 3) The lube oil header temperature is 140°F and header pressure is 45 psig. 4) Gas fuel supply pressure is 171 psig. Liquid fuel boost pressure is 23 psig. Gas valve command is 0% and liquid f

Author
zuhantoro
Language
EN

More by zuhantoro

Browse all works by zuhantoro