Skip to content

Opening book details…

About this document

3.2 Preliminary Utilities List by Hernan Valderrama is a document available to read on EtoBox.

The document outlines the utility list for project number 20743, commissioned by ENAP at the Terminal Cabo Negro site, with a final destination in Magallanes, Chile. It details the specifications for various fluids, including process gases, water consumption, purge systems, and disposal fluids, along with their required pressures, temperatures, and flow rates. Additionally, it includes notes on water quality requirements and instrument air standards.

Author
Hernan Valderrama
Language
EN