Opening book details…
Can I read Fokker F-50/60 Inspection Plan on EtoBox?
Fokker F-50/60 Inspection Plan by MARTIN ALCIDES ROJAS NAPA is a document available to read on EtoBox.
What is Fokker F-50/60 Inspection Plan about?
This document is a maintenance inspection planilla for aircraft AE-565, a Fokker F-50/60, for segment 1. It lists 97 items to inspect, including temperature controls, lighting, hydraulic and electrical systems, engines, landing gear, and windows. The inspection is scheduled to take place from September 4 to October 6, 2023 according to the maintenance manual dated June 1, 2023. Total aircraft hours are 11,184.9 with 6,848.1 partial hours.
- Author
- MARTIN ALCIDES ROJAS NAPA
- Language
- EN