About this document
Underground Utility Survey Methodology by بسام عوض is a document available to read on EtoBox.
This document provides a method statement for conducting a geophysical survey using ground penetrating radar (GPR) to detect underground utilities at the Dibba Bulk Handling Terminal project site. The survey will use a GPR system with 300 MHz and 800 MHz antennas to map subsurface features up to 3 meters deep. GPR data will be processed and inverted to produce 2D radar images of the subsurface. The survey aims to identify buried utilities to inform excavation and prevent damages. Quality assurance measures
- Author
- بسام عوض
- Language
- EN