Skip to content

Opening book details…

About this document

FCU Installation Issues at Tower 07 by SIBIN is a document available to read on EtoBox.

The air conditioning unit installed on the 7th floor of Tower Flat #2 had several issues with its support and installation including a damaged anti-vibration bush, bent transfer rods, a stretched out flexible supply duct connection, damaged foam insulation and a hole in the drain tray that needed rectifying. Additional works still needed to be completed involved connecting the fresh air duct, electrical wiring, condensate drain piping, properly installing valve packages and strainers with insulation, adding

Author
SIBIN
Language
EN