Skip to content

Opening book details…

Can I read 104022-04 - P&IDs Systemized (2) 2024-08-02 10 - 02 - 36 on EtoBox?

104022-04 - P&IDs Systemized (2) 2024-08-02 10 - 02 - 36 by Alwi Hasibuan is a document available to read on EtoBox.

What is 104022-04 - P&IDs Systemized (2) 2024-08-02 10 - 02 - 36 about?

The document outlines the commissioning details for the Martabe Tailings Filtration Project, including various components and their associated pump and filtration systems. It lists the specific sub-components (SUB-PCM) related to tailings management, water supply, and filtration processes. Each sub-component is identified by a unique PCM number and includes references to related equipment and piping.

Author
Alwi Hasibuan
Language
EN