Skip to content

Opening book details…

About this document

Construction Equipment Schedule by Hendra Febriant is a document available to read on EtoBox.

The document outlines the equipment schedule for the construction of the Karalloe Dam Stage II project located in Gowa Regency, South Africa from 2018 to 2020. It details 33 pieces of construction equipment such as excavators, bulldozers, dump trucks, rollers, and others. The schedule indicates when each unit will be needed on site over the course of the three year project, with most equipment being fully utilized from 2018 through 2020.

Author
Hendra Febriant
Language
EN