Can I read DBM-Bumanik Drilling Progress Update on EtoBox?

DBM-Bumanik Drilling Progress Update by Oscar is a document available to read on EtoBox.

What is DBM-Bumanik Drilling Progress Update about?

The document provides drilling progress updates for 4 rigs (GMS-01 through GMS-04) operating at the Block Keuno Pit B site in September 2019. By September 15th, the rigs had completed a total of 401.4 meters of drilling, averaging 10.04 meters per day, reaching 40.14% of the planned 1000 meter goal for the month. Each rig performed between 56.1 and 128.1 meters of drilling with average core recovery rates above 97%. A total of 14 holes were completed.